Employer
Republic of Turkey State Railways (TCDD)
Main Contractor
Yapı Merkezi-CDT Joint Venture
Subcontractor
Duygu Contracting and Construction Inc.
Project Location
Nurdağı-Malatya Section
Contract Date
03.06.2024
Final Bill of Quantities (F.B.Q.)
4,413,282,369.00 TL
Scope of Contract
Infrastructure Works, Superstructure Works, Steel Bridge Construction, Historical Bridge Restoration and Tunnel Construction Works (Construction Works)
Project Description
The project includes T7 Ripaj Tunnel (920 m), two steel bridges (with reinforced concrete foundations and piers), support works for the existing T7 Tunnel, excavation and slope support works for T8 Tunnel, and slope support and structure works between T5 Tunnel and Bridge No. 1.