Employer
Republic of Turkey General Directorate of Highways
Main Contractor
Kolin-Limak Joint Venture
Subcontractor
Duygu Contracting and Construction Inc.
Project Location
Kahramanmaraş, Turkey
Contract Date
10.06.2013
Project Completion Date
31.05.2018
Final Bill of Quantities (F.B.Q.)
357,854,401.12 TL
Scope of Contract
46.68 km divided highway standard Kahramanmaraş - Göksün - 6th Region Boundary State Road Km 13+900.00 - 60+577.99 section; earthworks, structures, tunnel, lean concrete subbase, lean concrete base and asphalt works, including one year of maintenance.
Project Description
Located within the boundaries of the 5th Regional Directorate of Highways, the Kahramanmaraş - Göksün - 6th Region Boundary Km 13+900.00 - 60+577.99 State Road starts from Ceyhan Bridge at the exit of Kahramanmaraş province and ends by connecting to the Section 2 Construction Project start at Tekir town. This road includes 3 double-tube tunnels totaling 4,004 m, 10 underpass bridges totaling 583 m, 2 overpass bridges totaling 112 m, and 61 box culverts totaling 4,921 m with various cross-sections.