Employer
Republic of Turkey General Directorate of Highways
Main Contractor
Kolin-Limak Joint Venture
Subcontractor
Duygu Contracting and Construction Inc.
Project Location
Kahramanmaraş, Turkey
Contract Date
06.12.2011
Project Completion Date
31.03.2015
Final Bill of Quantities (F.B.Q.)
223,863,683.05 TL
Scope of Contract
23.08 km divided highway standard Kahramanmaraş - Göksün - 6th Region Boundary State Road Km 60+577.99 - 83+660.30 section; earthworks, structures, tunnel, lean concrete subbase, lean concrete base and asphalt works, including one year of maintenance.
Project Description
Located within the boundaries of the 5th Regional Directorate of Highways, the Kahramanmaraş - Göksün - 6th Region Boundary Km 60+577.99 - 83+660.30 State Road starts from Tekir district of Kahramanmaraş and ends by connecting to the Kayseri Road Level Crossing west of Göksün. This road includes 2 viaducts totaling 569 m, 3 double-tube tunnels totaling 4,556 m, 1 overpass bridge, and 35 box culverts totaling 2,650 m with various cross-sections.