Employer
Ministry of Transport and Infrastructure, General Directorate of Infrastructure Investments
Main Contractor
Kolin Construction Tourism Industry and Trade Joint Stock Company
Subcontractor
Duygu Contracting and Construction Inc.
Project Location
Ankara
Contract Date
04.12.2017
Project Completion Date
04.12.2022
Final Bill of Quantities (F.B.Q.)
551,552,178.83 TL
Scope of Contract
Construction of a 3.65 km metro line, 3 stations, and supply, installation, and commissioning of electromechanical systems.
Project Description
This is the continuation of the Keçiören metro line (M4), covering the approximately 3.65 km section between Atatürk Cultural Center (AKM) and Kızılay Stations with three stations: Gar, Adliye, and Kızılay. Scope includes construction, architectural, mechanical, finishing, track and track superstructure works, design of electromechanical systems and subsystems for minimum maintenance requirements, supply, installation, and commissioning. Integration works with similar systems built under other contracts (M4-M1 connection line, M4 line) are also included.
Katalog