Scope of Work
Kahramanmaraş-Göksun 6th Region Boundary Road Km 13+900-G:33+870 / I:41+511 Earthworks, Structures, Bridge, Tunnel (Including Lighting, Ventilation, Electrical and Electromechanical Works) and Asphalt Superstructure Construction Works
Employer
Republic of Turkey General Directorate of Highways
Contractor
Duygu Contracting and Construction Inc.
Project Location
Kahramanmaraş, Turkey
Contract Date
30.05.2016
Project Completion Date
22.12.2020
Final Bill of Quantities (F.B.Q.)
618,964,018.32 TL
Scope of Contract
19.97 km divided highway standard Kahramanmaraş - Göksün - 6th Region Boundary State Road Km 13+900-G:33+870 / I:41+511 earthworks, structures, bridge, tunnel (including lighting, ventilation, electrical and electromechanical works) and asphalt superstructure construction works, including three years of maintenance.
Project Description
Starting from Ceyhan Bridge exit at Km 13+900 on the Kahramanmaraş-Göksun State Road and ending at Km 33+870, this section is 19.970 km long. The project includes 5 double-tube tunnels totaling 8,005 m, 33 box culverts totaling 2,813 m, and 3 intersections for residential areas and tunnel access roads. The 2x2 lane road is being built with asphalt superstructure.